Multi-Unit GAF UHDZ Roof Replacement in Pittsburgh
A large multi-family property in Pittsburgh needed a complete roofing update after roughly four decades of service. Wind had already removed several shingles, and the four property owners agreed that continued spot repairs would not provide the dependable protection the building required. My Pittsburgh Roofing completed a full tear-off and installed a coordinated GAF roofing system designed to protect every residence beneath the shared roof.
Project Overview
Location: Pittsburgh, PA 15217
Property: Residential multi-family property
Project: Full roof replacement
Approximate roof size: 66 squares
Existing roof: Approximately 40-year-old 3-tab asphalt shingles
New roofing: GAF Timberline UHDZ asphalt shingles
Color: Hickory
Installation time: 1 working day, with a rain-related scheduling delay
The Challenge
The primary challenge was the age and scale of the existing roof. The 3-tab shingles were approximately 40 years old and had reached the end of their useful life. Missing shingles created an immediate vulnerability, while the shared ownership structure required clear coordination so the entire roof could be replaced as one unified project rather than addressed in separate sections.
Inspection and Project Plan
Our crew planned a full roof replacement for the approximately 66-square system. Once the old shingles were removed, the roof deck was inspected and repaired where needed. The new assembly included leak protection at vulnerable areas, proper edge components, new ventilation, chimney flashing, and GAF Timberline UHDZ shingles in Hickory. The color was selected to complement the building while giving all owners one consistent, upgraded exterior.
Work Completed
Complete tear-off and disposal of the existing 3-tab shingles
Roof decking repair or replacement where required
Ice-and-water leak barrier and starter shingles
GAF Timberline UHDZ field shingles in Hickory
Matching ridge-cap shingles
New ridge ventilation
Drip edge and gutter apron
Chimney flashing
Final project inspection
Final Result
The completed roof gives the entire multi-family property one durable, cohesive roofing system instead of an aging surface with wind-damaged areas. All four owners now benefit from improved weather protection, a cleaner exterior appearance, and the confidence that the shared roof was replaced as a complete system. Despite a rain-related schedule adjustment, the roofing work itself was completed in one working day and passed the final project inspection.
Planning a Multi-Family Roof Replacement in Pittsburgh?
My Pittsburgh Roofing helps property owners, associations, and multi-family buildings coordinate complete roof replacements with clear scopes, dependable materials, and professional installation. Schedule an inspection to discuss the condition of your shared roof and receive a project-specific estimate.